Our Projects
Outstanding Results
East Kent Resignalling Project Phase 2
The phase 2 project comprised the total renewal of life-expired signalling on a section of the Chatham Main Line between the end of the Phase 1 project near Sittingbourne, and the Victoria Signalling Centre control area near Longfield, alongside the re-control and partial renewal or modification of existing signalling on connecting routes.
Angerstein Signal Renewals
Renewal of life expired signalling equipment and associated assets in the Angerstein interlocking control area and the London end fringe to North Kent East. Replacement of the Route Relay Interlocking with a Westlock CBI using SSI TFMs and the re-control of Angerstein from London Bridge signal box to Three Bridges ROC
King's Cross Remodelling
A once in a lifetime upgrade to a world-renowned transport gateway, enabling growth, increasing reliability and maximising capacity for the passenger